Cabral Gold Reviews Progress During 2024 and Outlines Plans for 2025 at Cuiú Cuiú Gold District, Brazil
Cabral Announces Filing of NI 43-101 Technical Report for Prefeasibility Study on the Gold-in-Oxide Starter Operation at the Cuiú Cuiú Gold Project, Brazil
Cabral Gold Identifies Fifth Gold-in-Oxide Blanket and Trenches 18M @ 1.9 g/t Gold on Surface at the Jerimum Cima Target, Cuiú Cuiú Gold District, Brazil
Cabral Gold Drills 5m @ 24.5 g/t Gold in Step-Out Hole at the Machichie NE Target, Cuiú Cuiú Gold District, Brazil
Cabral Gold Announces Positive Prefeasibility Study on the Gold-in-Oxide Starter Operation at the Cuiú Cuiú Gold Project, Brazil with After-Tax IRR of 47.3%
Cabral Gold Announces That Metallurgical Test Results from MG Gold-in-Oxide Material at Cuiú Cuiú Indicate 92 – 93% Gold Leach Recoveries