Cabral Gold Announces First Gold Sales from Phase 1 Mine, Cuiú Cuiú Gold District, Brazil
Cabral Gold Announces First Gold Pour at Phase 1 Mine, Cuiú Cuiú Gold District, Brazil
Cabral Gold Drills 8.9m @ 5.8 g/t gold and Intersects New Mineralized Zone at Jerimum Cima Target, Cuiú Cuiú Gold District, Brazil
Cabral Gold Announces Closing of $45 Million Private Placement with Strategic Investor
Cabral Gold Receives Operating License for the Cuiú Cuiú Phase I Gold Mine. Construction of ADR Leach Processing Plant Completed. First Gold Production Anticipated Ahead of Schedule
Cabral Gold Appoints Accomplished Exploration Geologist Elton Pereira as Vice President Exploration
Cabral Gold Announces Additional Drill Results from Pre-Production Infill Drilling at the MG Gold Deposit, Cuiú Cuiú Gold District, Brazil
Cabral Gold Commences Commissioning Process of Cuiú Cuiú Gold-in-Oxide Heap Leach Project. Commences Mining and Stacking
Cabral Gold Drills Significant New Mineralized Zone between the Central and PDM Gold Deposits and Expands the PDM Gold-in-Oxide Blanket, Cuiú Cuiú Gold District, Brazil
Cabral Gold Drills 25m @ 7.5 g/t Gold Including 10m @ 17.1 g/t Gold as Part of Pre-Production Infill Drilling, MG Gold Deposit, Cuiú Cuiú Gold District, Brazil
Cabral Gold Drills 107.6m @ 2.5 g/t Gold Including 17.8m @ 13.0 g/t Gold at Jerimum Cima Target, Cuiú Cuiú Gold District, Brazil
Cabral Gold Announces Additional Results of Infill Drilling at the MG Gold deposit, Cuiú Cuiú Gold District, Brazil
Cabral Gold Drills 10.2m @ 8.7 g/t Gold Including 1.3m @ 62.5 g/t Gold at Jerimum Cima Target, Cuiú Cuiú Gold District, Brazil
Cabral Gold Announces Additional Results of Infill Drilling at the MG Gold Deposit, Cuiú Cuiú Gold District, Brazil. Doubles Number of Drill Rigs on Site to Six