News

Filters
Filter by Year
Reset

Cabral Gold Announces Positive Prefeasibility Study on the Gold-in-Oxide Starter Operation at the Cuiú Cuiú Gold Project, Brazil with After-Tax IRR of 47.3%

Cabral Gold Announces That Metallurgical Test Results from MG Gold-in-Oxide Material at Cuiú Cuiú Indicate 92 – 93% Gold Leach Recoveries

Cabral Gold Drills 6m @ 13.3 g/t Gold in Step-Out Hole at the Machichie NE Target, Cuiú Cuiú Gold District, Brazil

Cabral Gold Drills 10m @ 3 g/t Gold at the Machichie West Target, Cuiú Cuiú Gold District, Brazil

Cabral Gold Announces Appointment of Samantha Shorter as Chief Financial Officer

Cabral Gold Drills 11m @ 33.0 g/t gold at the Machichie NE Target, Cuiú Cuiú Gold District, Brazil

Cabral Gold Provides Update on Prefeasibility Study at Cuiú Cuiú Gold Project, Brazil

Cabral Gold Extends Drilling Program at Cuiú Cuiú Gold District, Brazil

Cabral Gold Announces Final Closing of Over-Subscribed Private Placement

Cabral Gold Announces Closing of First Tranche of Over-Subscribed Private Placement

Cabral Gold Announces $2M Private Placement Financing

Cabral Gold Appoints Brian Arkell as Vice President Exploration and Technical Services

Cabral Gold Drills 23m @ 1.0 g/t Gold in Oxidized Material from Near-Surface at Central and 19m @ 1.3 g/t Gold at MG

Cabral Gold Drills 30m @ 2.6 g/t Gold in Oxidized Material from Surface at Machichie

Secret Link